Tunnel Ventilation and Lighting System is totally Auto Control, of course with a manual override facility. All Substation Parameters and Tunnel Ambience Parameters are visible on the PC as well as on Mimic Panel. The Operation is primarily from the PC but the full operation and monitoring can be done through the Mimic Desk. PC side software has got all data log facility with Alarm annunciation and other facilities.
Rays Electronics have successfully completed one complete project of Road Tunnel lighting and Ventilation system along with CCTV. Control Desk is having the PC based control of the Total Lighting and Ventilation along with a parallel
Mimic operated Desk for the redundant operation in case if the PC fails.